Bangkok Logistics Hub

Cross-dock distribution facility with budget approved for a turnkey EPC rooftop installation and optional storage phase.

Estimated capacity
520 kWp
Bangkok Logistics Hub — representative rooftop solar site visual

Opportunity overview

Capex is approved for the current fiscal year and the operator is ready to appoint an EPC partner. Scope includes design, supply, installation and a five-year O&M package, with an optional second phase for battery storage to shave evening peaks.

Project profile

Anonymised owner
Regional 3PL operator (anonymised)
Province / utility area
Bangkok · MEA
Sector
Logistics
Estimated capacity
520 kWp
Annual electricity consumption
3,150 MWh / year
Operating schedule
Extended day operation 05:00–23:00, seven days
Roof / site characteristics
Insulated metal deck, 2021 construction, no reinforcement expected — 5,300 m² usable
Preferred model
EPC
Battery storage
Optional second phase
Project maturity
Ready to develop
Indicative timeline
EPC appointment Q4 2026, energisation Q2 2027

Key project highlights

  • Capex approved — no financing structure required
  • Recent roof with strong structural condition report
  • Five-year O&M included in the intended scope
  • Optional BESS phase for evening peak shaving